The Wormington-Sapperton pipeline, which received Government consent in November 2009, will be 900mm (36 inches) in diameter and will run for 44km (28 miles), connecting our compressor station at Wormington, near Broadway, to our above-ground installation at Sapperton, near Cirencester.